Full tear-off
Everything down to the deck, rotten boards replaced, ice and water at the eaves and the valleys, and a new roof over the whole thing. Two to three days on a normal house.
Stefko Boulevard · Bethlehem, Pennsylvania Est. 1994
Tear-offs, leak repair, storm work and the copper and flashing most roofing companies hand to somebody else. We measure the roof before we put a number on it, and the number we give you is the number you pay.
Every course covers the nail line of the one below it. Get that overlap wrong by half an inch and the roof leaks in year six instead of year thirty — and nobody finds out until it does.
Tear-off, deck check and dry-in, same day Everything off the lawn before we leave Northampton & Lehigh counties
Course 01 · What we do
Most people who call us do not know whether they need a repair or a roof, and a fair number have been told they need a roof when they do not. We go up, we photograph what is there, and we say which of these four it is before anybody talks about money.
Everything down to the deck, rotten boards replaced, ice and water at the eaves and the valleys, and a new roof over the whole thing. Two to three days on a normal house.
Finding it is the job; fixing it is usually an hour. Nine out of ten leaks we chase turn out to be flashing, a pipe boot or a nail that backed out — not the shingles.
Wind and hail, tarped the day you call if it is open. We document it the way an adjuster needs it documented, and we will tell you when a claim is not worth filing.
Seamless aluminium run on site, and copper for the houses that deserve it. The soldering is done by us, on our own bench, not bought in.
Course 02 · How a roof is actually built
This is the part that makes a roof cheap or expensive, and it is the part nobody can inspect from the driveway. When a bid comes in four thousand dollars under everybody else’s, one of these six is missing.
Anything soft gets cut out and replaced. On a Bethlehem house from the 1920s this is usually a few boards near the chimney, and occasionally a whole plane.
A self-adhering rubber membrane that seals around the nails. This is what stops an ice dam in February from coming through your bedroom ceiling.
The white sheet in the photograph up top. It keeps the house dry between the tear-off and the new roof, and it is the second line for the next thirty years.
A sealed strip under the first visible row. Left out — and it often is — the wind takes the bottom row off first and then everything above it.
The part you can see. Nailed in the manufacturer’s nail zone, six per shingle where the wind rating requires it, never four to go faster.
A roof that cannot breathe cooks its own shingles from underneath. Half the “bad shingle” jobs we are called to look at are actually a ventilation problem.
The colour of this page is this: crushed stone, orange and charcoal, pressed into the asphalt. When those granules end up in your gutter, the roof is telling you how much life it has left.
Course 03 · What it costs
Nobody can price a roof over the phone, and anybody who does is either guessing high or planning to find something on day two. What we can do is tell you the range your house is in, so you know whether to keep reading.
One trip, one problem
$385flat, up to two hours on the roof
The usual job
$9,400–$16,80018 to 28 squares, architectural shingle
The work we do not sub out
from $110a linear foot, formed and soldered here
The inspection is free and it is not a sales visit. If your roof has eight good years left we will say so, put it in writing, and you can call us in eight years. We would rather lose the job than sell you one you did not need — this is a town where people talk to their neighbours.
Course 04 · Storm damage and the insurance company
A storm job that turned into a re-deck. We found it on the tear-off, stopped, photographed it and called the owner before we bought a single board.
After a bad night in the Lehigh Valley there will be people knocking on your door with a clipboard. Some of them are roofers. A lot of them are not, and by the time the cheque clears they are two states away.
Course 05 · The metal, which is where the leaks are
A roof is a field of shingles interrupted by chimneys, walls, pipes and valleys, and water finds every one of those interruptions. That is metal work, it is slower than laying shingle, and it is the first thing a cheap bid quietly leaves out — new roof, old flashing, tar over the top.
We form our own. There is a brake and a soldering bench in the shop on Stefko, and the copper that goes on your valley was cut and folded there by somebody whose name is in the next section.
A soldered valley about fifteen years in. The green is not damage — it is the copper sealing itself, and it is the colour we took this whole page from.
Course 06 · Who is actually on your roof
We run one crew. That is the whole business decision: it means we can only do about forty roofs a year, and it means the person who quoted your job is on the ladder when it is done.
Owner · estimator
Started as a labourer on Elm Street in 1994 and bought the truck in 2003. Does every measurement himself, which is why the quote takes two days instead of ten minutes.
Owner · sheet metal
Twenty-two years on the brake. Everything copper that leaves this shop went through her hands, and she will happily tell you why your last flashing job failed.
Foreman · tear-offs
Runs the roof while it is open, which is the job nobody sees: keeping the house dry between the old roof coming off and the new one going on.
Course 07 · The warranty, and what voids it
Every roof comes with a manufacturer’s warranty on the shingle and a workmanship warranty from whoever installed it. They cover completely different things, and the second one is the only one that has ever mattered on a job we have been called back to.
Course 08 · Where we work and when
Course 09 · What people ask on the driveway
The estimate is free, it takes about forty minutes, and you get the photographs whether or not you hire us. If the roof is fine we will tell you that and go away.